Contracts

From negotiation to the end of the relationship: drafting agreements, reviewing obligations and resolving disputes.

Yaacov Amsellem · Updated 15 November 2026

Contracts underpin many decisions in private life and business. Buying property, commissioning services, lending, leasing, investing and forming a partnership all depend on agreements that define what each party provides, what they receive and on what terms. The legal discussion in this article concerns Israeli law.

At the outset, attention usually centres on the price and the desired result. Other questions arise later: what happens if payment is delayed, additional work is needed, a party wants to leave, or promises made during discussions do not appear in the signed document?

An agreement tailored to the transaction should address these questions too. It should record the agreed terms, organise performance and help the parties understand what is expected throughout their relationship.

When an agreement becomes binding

A contract does not always have to be a printed document bearing signatures. As a general rule, a contract may be made orally or in another form, unless the law or the parties require a particular form. Assessing whether a contract exists involves, among other things, the intention to be bound and the specificity of the agreed terms.

An accepted quotation, an exchange of messages or the start of performance can therefore have contractual significance. The answer depends on the content and circumstances. The absence of a signature does not by itself establish that no obligation arose.

In practice, the status of documents exchanged during negotiations should be made clear from the beginning. If the intention is to commit only after checks, approval or signature of a complete agreement, that intention should be reflected clearly in both correspondence and conduct.

Negotiation is part of the legal work

Parties negotiating a contract must act in good faith. Their conduct may have legal consequences even if the transaction does not proceed.

Before exchanging drafts, it is useful to define the transaction: what the parties want to achieve, which conditions are essential, what needs investigation and what remains negotiable. Without that clarity, discussions can focus on wording without resolving the practical issue behind a clause.

For example, disagreement over compensation for delay may arise because the parties never agreed what counts as completion. A dispute about payment dates may conceal a different understanding of who should finance the initial stage.

Keep proposals, drafts and meeting notes in an organised record. A significant promise made in conversation should be checked against the final text. If it matters to the decision to enter the agreement, it should be expressly addressed.

Heads of terms and preliminary memoranda

Parties sometimes want to record their initial understanding before preparing a full contract. They sign a short document and assume that the legal details will follow.

The document’s title alone does not determine its status. A memorandum or statement of principles may be binding, depending on its content and the circumstances. An undertaking to carry out a real estate transaction is generally subject to a writing requirement. The assessment does not end with whether a detailed contract has been signed.

Before signing a preliminary document, decide what it is intended to achieve. The parties may wish to agree confidentiality, a limited period for investigations or exclusivity in negotiations without completing the entire transaction. Provisions intended to bind immediately should be distinguished from matters still open for agreement.

Consider what happens if the investigations are unsatisfactory, who bears the costs and whether money already transferred must be returned.

Identify the parties and their authority

Before considering the terms, establish who the contracting party is. A trading name, project name or group name does not always identify the entity responsible for performance.

When dealing with a company, identify the particular company and who may sign on its behalf. If a representative negotiates for someone else, examine their authority. Where several people are involved, define who undertakes the work and who must pay.

There is also a distinction between a company’s obligation and a personal guarantee from a shareholder or director. Any intended personal liability needs to be expressly and properly documented.

The inquiry should also consider the practical ability to perform. Depending on the transaction, relevant checks may cover property rights, licences, experience, insurance and financial documents. Their scope should reflect the amount involved, the duration of the arrangement and the degree of reliance on the other party.

Define precisely what each party must do

An overly general description of the obligation is a common source of disagreement. Expressions such as “complete service”, “ongoing support” or “completion of the project” may mean different things to different parties.

A services agreement should identify the work, deliverables, timetable and information the client must provide. If performance requires approvals or cooperation from a third party, explain how this affects the work.

It is also important to distinguish a commitment to achieve a particular result from a commitment to carry out specified activities. Preparing an application to an authority does not necessarily mean guaranteeing approval. Producing marketing materials does not necessarily mean guaranteeing sales.

For example, a website agreement should identify the number of pages, who supplies text and images, the included revision rounds, mobile requirements and who receives administrative access at completion. Otherwise, the parties may agree on price while disagreeing on what has been purchased.

Price is only part of the payment arrangement

A contract should explain how payment is calculated and when it falls due. Check whether VAT is included, whether indexation applies, which expenses are separate and when additional payment may be requested.

For staged payments, milestones should be objectively identifiable. “Payment as work progresses” can invite disagreement. Linking payment to a defined action or deliverable is usually clearer.

Where payment depends on client approval, specify who may approve, the response period and how defects are to be corrected. Where an advance is required, examine what it finances and what protection is appropriate for someone paying before receiving performance.

Definitions are particularly important when payment is based on revenue, profit or commissions. Address which amounts enter the calculation, which costs are deducted, how refunds are treated and when supporting records may be inspected.

Changes to the work

Changes are foreseeable in projects and continuing relationships. A deliverable is added, the scope changes or an unforeseen task becomes necessary.

Agree a process for approving changes. Identify who may request additional work, who may authorise it and how its effect on price and timing is determined.

Distinguish correcting work that does not meet the contract from performing additional work. Without that distinction, the provider may charge for every requested correction, while the client may expect new requirements to be included in the original price.

A short, accurate record made when a change is agreed can prevent later disagreement. It should address both what changes and what remains in effect.

Conditions and approvals on which the transaction depends

Some transactions depend on financing approval, a licence, an owner’s consent, a professional inspection or a decision by an authorised body.

Define who is responsible for pursuing the condition, what they must do, how long the parties will wait and what happens if approval arrives on different terms from those expected.

For example, when leasing premises for a business, agreement with the landlord does not establish that the proposed activity may lawfully operate there. Examine the relevant requirements and allocate responsibility and risk in the contract.

Also decide what may be done while approval is pending. May renovations begin, equipment be ordered or money be transferred? Who bears those costs if the transaction does not proceed?

Security and guarantees

Security should address a specific exposure. Start by identifying what needs protection: repayment of an advance, payment of a debt, correction of defects, delivery of property or timely vacation of premises.

Depending on the transaction, possible tools include a deposit, guarantee, promissory note, registered security or funds held in escrow. Each has its own conditions and limitations and must be matched to the obligation and the parties.

Review the amount, validity period, enforcement conditions and release date. Check that security does not expire before the risk ends and that there is a renewal mechanism if the arrangement is extended.

The person providing security also needs to understand their exposure. A guarantee without a monetary or time limit requires a different assessment from a guarantee for a specified obligation. Describing a document as a “standard form” is not enough.

Liability, indemnity and insurance

Liability provisions allocate the consequences of damage or a third party claim. Review them against the actual activity: who controls the risk, who holds the relevant information and who can prevent the damage?

An indemnity clause should identify the situations it covers, how a claim is notified, who controls the defence and whether consent is needed before a settlement.

If liability is limited, determine the losses covered, the cap and any exceptions. The provision must also be assessed against the law applicable to the arrangement.

An insurance requirement needs separate review. Establish the necessary cover, period and amount. The existence of a policy does not establish that every contractual risk is insured.

Confidentiality, information and rights in deliverables

Where the arrangement involves business information, client data, plans, designs or software, their use needs to be addressed.

A confidentiality clause should define the protected information, who may receive it for the work and what must happen to it at the end. Consider whether separate privacy and information security provisions are needed.

Define who owns the deliverables, which rights of use are granted and what remains with the creator or provider. Include practical arrangements for handing over files, passwords, permissions and source materials.

For a website, for example, it matters in whose name the domain, hosting account and licences are registered. Arranging access enables the client to continue using the site and change provider when necessary.

Duration and ending the agreement

An agreement for a fixed period, an automatically renewing contract and a continuing arrangement without an end date need different provisions.

Specify the starting date, any trial period, the renewal process and what is required to prevent renewal. If termination on notice is permitted, define the notice period and the obligations during the transition.

Address unfinished matters too: payment for completed work, outstanding orders, return of equipment, transfer of documents and release of security.

For example, ending a relationship with a provider managing an essential system should include arrangements to transfer information and access. Without them, operations may be disrupted even after both sides agree to separate.

Interpreting a contract when a dispute arises

Section 25 of the Israeli Contracts Law was amended in January 2026. The amendment addresses agreements on interpretation and the evidence used for that purpose, and sets different rules for different categories of contract.

For a business contract without agreed interpretation provisions, interpretation generally follows the wording alone, subject to exceptions including an unreasonable result or conflicting provisions. Other contracts, including standard form contracts, are subject to a framework that also considers the circumstances. Limitations also apply to interpretation agreements and legal representation.

The new provisions apply to contracts concluded after the law took effect. Renewal is treated as conclusion for this purpose. The type of arrangement and its date of conclusion or renewal therefore need to be checked.

In practice, check that the contract is internally consistent and that its schedules align with it. Establish which document prevails if there is a conflict and include the agreements on which the parties rely in the final text. Clear drafting reduces later disputes about the original intention.

Mistake, misrepresentation and pressure to sign

Sometimes the difficulty lies in how the decision to contract was made. Mistake, misrepresentation, coercion or exploitation may provide grounds for cancellation when the statutory conditions are met. Regret or disappointment alone does not establish such grounds. The timing and method of notice also matter.

If a significant gap emerges between the information supplied and reality, collect the documents and establish exactly what was said, when the new information became known and how it affected the decision to contract.

Distinguish a fact represented as existing from a forecast, assessment or hope for a future outcome. The inquiry should also consider the documents available and checks made before entering the agreement.

Breach and the injured party’s options

A breach may give rise to enforcement, cancellation and damages, subject to the legal conditions. Enforcement has exceptions, including personal services, impossibility of performance or injustice in the circumstances.

For a breach that is not fundamental, an opportunity to perform is generally required before cancellation. Even where cancellation is justified, notice must be given at the appropriate time and in the appropriate manner. Cancellation may require mutual restitution.

A damages claim requires examination of the loss, its connection to the breach and its foreseeability when the contract was made. Reasonable steps to mitigate loss also matter. Agreed damages may be awarded without proof of loss, but the court may reduce them under the statutory test.

Before cancelling, stopping payment or enforcing security, read the entire agreement and review the sequence of events. A response that exceeds the available rights may create another dispute.

Prepare a short chronology: what was promised, when performance was due, what actually happened and which notices were sent. Then define the objective: completion, correction, payment, revised terms or an orderly end to the relationship.

Templates and standard form contracts

A template can help organise a document, but its suitability for the particular transaction must be checked. A clause appropriate for one arrangement may be irrelevant or create risk in another.

Unfair terms in standard form contracts may also be subject to judicial review. A client’s signature does not ensure every provision is valid. The assessment considers the particular term and the arrangement as a whole.

When using a template, pay particular attention to the service description, duration, exit rights, liability, security and dispute resolution. Remove references to documents that do not exist and ensure the clauses reflect what was actually agreed.

A process for resolving disputes

A contract can provide a process for addressing disagreement before proceedings begin: a formal referral, a meeting of authorised representatives, mediation or expert determination of a defined technical question.

Set time limits and consider what happens meanwhile. Does work continue? Which payments are undisputed? Must urgent access to the court remain available?

If arbitration is being considered, examine the appointment process, costs, scope of determination and available avenues of challenge under the chosen arrangement. For an international transaction, separately examine governing law, the forum for proceedings and enforcement options.

What to prepare for a contract review

To focus the review on the actual transaction, provide the complete picture:

  1. The latest draft and every schedule it refers to.
  2. Quotations, orders and records of agreed terms.
  3. Details of the parties and those managing the arrangement.
  4. A short description of the transaction’s purpose and intended performance.
  5. The terms that matter most to you.
  6. Payments already made and commitments already given.
  7. Approaching deadlines, required approvals and dependencies on others.
  8. Correspondence about any dispute that has already arisen.

Explain what concerns you about the draft. The concern may come from circumstances the agreement has not addressed, rather than from a particular clause.

Frequently asked questions

Is a short contract worth reviewing?

Yes. Length does not necessarily reflect the extent of the commitment. Review what the document governs, which documents accompany it and which important matters remain unanswered.

Does the whole agreement need to be rewritten?

Not always. Targeted changes may achieve the objective. Distinguish essential terms, negotiable points and changes with little practical effect.

What if a verbal promise is missing from the contract?

Ask for it to be addressed before signing. Define the promise, who is responsible and the deadline. If the other party will not include it, resolve that issue before relying on it.

Can a contract change after work begins?

An agreed variation can be considered and documented appropriately. Record when it takes effect, how it affects price and timing, and what happens to obligations already performed.

What should be checked before renewal?

Consider whether the service and price remain suitable, what difficulties arose previously, whether security and insurance remain valid and whether exit terms need updating. Renewal is also an opportunity to document changes previously handled informally.

Should I send an immediate cancellation notice after a breach?

First examine the agreement, the breach and the desired outcome. Some situations call for correction or completion; others warrant considering termination. Distinguish a warning from a cancellation notice and draft each accordingly.

How can dependence on a provider be reduced at the end?

Agree in advance on handing over information, files, permissions and equipment, with a transition period where necessary. The contract should establish what the client retains and what must be done to continue operations.

What does legal assistance with contracts involve?

It can include examining the transaction’s structure, preliminary checks, drafting or reviewing an agreement, negotiations and documenting changes during performance. If a dispute arises, the work includes reviewing the documents, settlement options and the need for proceedings.

The scope should reflect the arrangement and the stage at which advice is sought. It is useful to obtain advice while there is still an opportunity to investigate, amend and agree the terms.

This article provides general information about Israeli law. It does not replace legal advice based on the agreement, supporting documents and circumstances of the particular arrangement.