A business may invest substantial sums in premises before its first customer arrives. Renovations, electrical and air conditioning systems, equipment, signage and preparation of the space are expenses incurred in the expectation of operating there for a considerable time.

The property owner also makes a significant decision: handing possession to a tenant, sometimes allowing alterations, and relying on payments over several years.

The lease should reflect those expectations. Alongside the rent and term, it should address use of the premises, works, expenses, repairs and what happens if either party wishes to end the arrangement.

Start with the property and the contracting parties

Before considering commercial terms, establish who holds rights in the property and who has authority to let it. Where several owners, a company, a representative or an attorney under a power of attorney are involved, check the authority to sign and the consents required.

For a sublease, review the head lease too. Establish whether it permits the arrangement, whether further consent is required and what will happen to the subtenant when the head lease ends.

The landlord also needs to know the identity of the contracting tenant. A company renting premises is legally separate from its shareholders. Signing on behalf of the company does not necessarily create a personal guarantee of its obligations.

Define the premises precisely. Do they include storage, parking, a yard, a separate entrance or a loading area? Which facilities are shared with other businesses? Where a written description is insufficient, attach a marked plan.

Can the intended business operate there?

Premises previously used for business are not necessarily suitable for the new activity.

Distinguish between the use permitted by the contract, planning status and licensing requirements. A landlord’s consent to operate a restaurant, for example, is not approval from the relevant authority.

Checks must address the specific activity and exact address. Depending on the business, questions may arise concerning a business licence, accessibility, safety, ventilation, infrastructure, noise and waste disposal. Preliminary licensing information can be requested from the local authority and, where appropriate, preliminary advice from the relevant approval bodies.

Do not rely on a general assurance that obtaining a licence will not be a problem.

If the arrangement depends on an approval not yet obtained, specify who will pursue it, by when, and what happens if the application is refused or the requirements make the project unviable. Address refunds, expenses already incurred and the condition in which the premises must be returned.

Rent is not the total cost

Two properties offered at the same monthly rent can cost a business very different amounts.

Before signing, bring together the full occupancy costs and consider the expenses that will apply after the setup period as well.

ItemWhat to agree
RentAmount, payment dates and VAT where applicable
Indexation and increasesBase index, frequency of adjustment and fixed increases
Management chargesIncluded services, calculation method and possible changes
Municipal rates and utilitiesPayer, registration of the occupier and allocation of consumption
Alterations and licensingWorks, professionals, fees and approvals
Insurance and securityInsurance costs and funds required as security
End of the leaseRemoval of equipment, repairs and return of the premises

Check whether different increase mechanisms accumulate. Indexation may apply alongside a fixed annual increase and a further increase during the renewal period.

Where a payment component is based on business turnover, define which revenue is included, how it is reported and the landlord’s verification rights.

Management charges and building rules

In a shopping centre or office building, some obligations may be set out in a separate management agreement.

Establish who sets the management charges, what they cover and how they may be adjusted. Distinguish routine services from exceptional expenditure, replacement of systems or significant upgrades.

Building rules also affect the business: opening hours, supplier access, use of lifts, signage, parking, security and access outside working hours.

Permission in the lease is not enough if the management company or building rules restrict the activity. Review these documents together.

When do payments begin?

Signing, receiving the keys, starting works and opening the business do not necessarily happen on the same date.

If a rent free period is allowed for alterations, define when it begins and what must be in place for works to start. Will the premises be vacant? Will electricity and infrastructure be operational? Must the landlord complete preliminary works?

Specify which charges apply during that period. A rent exemption does not necessarily cover management charges, municipal rates or electricity consumption.

Where a delay results from incomplete works or a document the landlord agreed to provide, settle in advance how it affects the start of payment obligations.

Renovations and alterations

Before works begin, define what may be done, which plans require approval and who is responsible for obtaining the necessary permits and consents.

Separate works promised by the landlord from the tenant’s works. For each, agree specifications, timing, responsibility and cost.

Particular care is needed for works affecting the building exterior, common property or adjoining premises. Opening a passage between two shops, installing a flue or placing equipment on the roof may involve more than an agreement between landlord and tenant.

Decide at this stage what happens when the lease ends. Will improvements remain? May the tenant remove systems? Must openings be closed and earlier internal partitions reinstated?

Photographs and a handover specification can prevent disagreement about the original condition.

Lease term and renewal option

The term should fit the investment and business plan. A tenant spending a substantial amount to prepare the premises needs to understand how long occupation is secured and on what terms.

The landlord may be planning a sale, renovation or another use. If the landlord retains a right to terminate early, examine its scope and effect on the tenant’s investment.

A renewal option should have a clear exercise mechanism. Specify who holds it, the notification deadline and method, and the rent and security required during the additional period.

Wording that leaves the price to future agreement may fail to provide sufficient certainty about continued occupation.

Who deals with faults and repairs?

The allocation of responsibility should address systems and types of faults, rather than merely saying that the tenant is responsible for every repair.

Routine maintenance, damage caused by use, a fault in a system installed by the tenant and a problem with the structure or a shared system are different issues.

Agree the procedure as well: whom to notify, response times, emergency arrangements and when a contractor may be called. The contract should address how responsibility is determined and who pays for the work.

If a fault prevents the business from operating, loss of business becomes a further issue. Do not assume that inability to use the premises always permits payments to stop. The agreement, cause of the fault and applicable law must be examined.

Insurance and security

Insurance should match the activity and allocation of responsibility. Distinguish cover for the building, business contents, liability to third parties and risks relating to works or employees.

Have the insurance requirements professionally reviewed before signing to establish that they can be met and that the cost has been considered.

Security also requires separate examination. A bank guarantee, deposit, promissory note and personal guarantee are not interchangeable. Each has different implications for the availability of money, enforcement and exposure of the tenant and guarantors.

Define the amount, validity, enforcement conditions and return date. Where several forms of security are provided, understand which obligations they secure and what happens on renewal or replacement of the tenant.

Selling the business or replacing the tenant

Over time, the business may be sold, expand or change its structure. Consider these possibilities when drafting the lease.

Distinguish a sale of equipment, transfer of business operations, change of shareholders, subletting and transfer of the lease to a new tenant.

Subject to applicable law, the agreement should identify when consent is required, which documents must be provided and the conditions for considering a replacement tenant.

A new tenant taking over does not guarantee that the previous tenant and guarantors have been released. If release is intended, it should be expressly agreed.

For a business operated by partners, the partnership agreement should also be aligned with the lease obligations and the possibility of a partner leaving.

Early exit and breach

A struggling business is not necessarily released from its lease. Check in advance whether there is an exit right, the notice period and any associated payments or conditions.

The landlord also needs a clear mechanism for nonpayment, unauthorised use or other breaches. Notices, opportunities to remedy and remedies should be addressed in accordance with the law.

Before termination, enforcement of security or action at the premises, check the legal requirements. A dispute does not, by itself, necessarily justify changing locks, disconnecting services or taking unilateral enforcement measures.

Principles concerning obligations, breach and termination mechanisms are also discussed in the article on business contracts.

An illustrative example

A business owner rents a shop for five years and plans to invest a substantial sum in renovations. The contract allows two months without rent but does not establish who must arrange the increased electrical capacity required to operate the equipment.

Works are delayed, the concession period ends and the business still cannot open.

To reduce the risk of such a dispute, agree infrastructure requirements, responsibility for delivery, the handover date and the effect of delays on the start of payments in advance. Where an approval is essential, specify what happens if it cannot be obtained.

This is an illustration only, not a description of a particular case.

Preparing for the end of the lease

Begin preparing to return the premises before the departure date.

Establish which works are required, what remains, what is removed and which accounts need settling. If the landlord can choose whether alterations remain or are removed, set a deadline for that decision.

At handover, record the condition, meter readings, keys and equipment delivered. Address final accounts and the conditions for releasing security as well.

A clear closing process serves both parties: the landlord can prepare the property for its next use, and the tenant knows what is needed to discharge its obligations.

Frequently asked questions

Can a residential tenancy agreement be used?

It should not be relied on without substantial adaptation. Business activity requires provisions concerning use, licensing, investment, systems, insurance and obligations that a residential agreement may not address.

Is the previous business’s licence sufficient?

Do not assume so. Check the intended activity, identity of the operator, alterations to the premises and the local authority’s applicable requirements.

Can the tenant leave if the business makes a loss?

Not necessarily. Check whether an exit right or replacement tenant mechanism was agreed, and the conditions for using it.

Who pays to replace an air conditioning unit or an old system?

This depends on the agreement, the system and the reason for replacement. Define in advance the distinction between maintenance, repair and replacement of a system that has reached the end of its useful life.

Can the landlord sell during the lease?

A sale does not necessarily end the tenancy. Examine the contract, status of the rights and applicable law, and arrange the continuation of payments, security and obligations.

When is a guarantee returned?

According to the agreement and the law, after checking the obligations it secures. Set a timeframe and required documents, and address any liability that remains unresolved.

What should be provided for review before signing?

The draft lease and management agreement, a plan, rights documents, description of the activity, estimated alteration costs and available planning and licensing information. Specify the intended operating period and who will sign or provide guarantees.

This is general information about commercial leases in Israel and does not replace individual legal advice. The agreement should fit the property, activity, planned investment and parties’ circumstances.

View the practice area