Business Contracts: What Should Be Agreed Before Signing?

Structuring work, payments and liability in agreements with customers, suppliers and service providers

Yaacov Amsellem · Updated 18 November 2026

The quotation looks suitable, the other party seems serious, and both sides want to get started. This is precisely the time to pause and turn the understanding into an agreement that can be performed: what will be provided, who may approve a change, when payment is due, who owns the rights, and how the relationship will end if circumstances change.

This guide concerns commercial arrangements in Israel: services, supply, distribution, development and business collaborations. The examples are illustrative only and do not describe matters handled by the firm.

No single contract suits every business. Even a lengthy document does not guarantee that the important issues have been addressed. The aim is to establish whether someone who did not participate in the negotiations could understand the obligations from the documents, check whether they have been performed, and know what to do if circumstances change or a dispute arises.

What needs attention in your agreement?

Choose the type of engagement and its stage. This list helps organise documents and discussion points; it does not determine validity or suitability.

Gather the draft, annexes and commitments already made. Clarify open points before performance starts.

Go to the relevant chapter

Marking items is an organisational aid, not a legal risk score or confirmation that the contract protects you. Do not enter personal information or documents here.

What should be checked before choosing a contract template?

Before revising clauses, define the transaction itself. Is the business buying a product, commissioning a service, appointing a distributor or collaborating in a shared activity? Is the arrangement a one-off transaction or an ongoing relationship? Who depends on whom, and what would be needed to replace the other party? The answers affect payment arrangements, security, liability and termination.

Type of arrangementWhat should be definedA practical question to ask
Supply of productsSpecifications, quantities, delivery, inspection and dealing with defectsWho bears a loss occurring before the shipment is received?
Service or projectDeliverables, scope, milestones and approval of changesIs the next round of revisions included in the price?
Distribution or agencySales arrangements, channels, stock, reporting and accountingWho sells to the customer, and who bears an unpaid debt?
Development or content creationOwnership, licences, source files and third-party componentsWhat may continue to be used after the arrangement ends?
Business collaborationEach party’s contributions, authority, income and exit arrangementsWho may make commitments on behalf of the activity?

The title alone is not decisive. A document called a “distribution agreement” may in practice govern an agency, sale or services relationship. The way the arrangement operates and the applicable law must be examined. Arrangements involving employees, consumers, regulated parties or parties with particular protected rights require further adjustments; an ordinary commercial template should not automatically be copied into them.

Common types of business contract

A services contract: what exactly is being commissioned?

A services contract defines the activities, deliverables, performance dates and each party’s responsibilities. Distinguish hourly work, a retainer or a continuing service from a project with a defined result. An undertaking to devote time or carry out activities is not always an undertaking to achieve a particular result, so the scope of the obligation must be stated precisely.

Define what is excluded, how many rounds of revisions are included, what counts as approval of a deliverable and what happens if the customer does not provide information on time. If availability after delivery is required, clarify whether this means responsibility for correcting defects or an additional support service. Do not assume that the label “independent service provider” alone determines whether an employment relationship exists or resolves other statutory obligations.

A supply contract: from order to receipt of the product

A supply contract defines the product, specifications, quantity, required standards or approvals and delivery dates. For repeat orders, specify how an order is approved, whether a minimum quantity applies and how prices are updated. Alongside the promise to supply, establish what makes performance possible in practice: stock availability, transport, access to the site and unloading.

Address when the product’s conformity is checked, how a shortage or defect is notified and how it is dealt with: repair, replacement, supplying missing items or another solution under the agreement and applicable law. Also address the transfer of ownership and risk, partial orders, packaging, transport costs and returns. When supply includes installation or maintenance, coordinate delivery of the product with the accompanying service rather than leaving a gap between two documents.

A distribution or agency contract: who sells, and how are payments calculated?

A distributor who buys products and sells them on its own account operates differently from an agent who brings customers to a supplier or someone paid for marketing activities. Identify the party contracting with the customer, responsibility for collection and ownership of stock. Application of the Agency Contract Law depends on the substance of the arrangement. Do not assume that everyone described as a “distributor” is automatically entitled to compensation under it.

Define the products, sales channels, territory, term and any agreed exclusivity. Connect exclusivity with appropriate obligations and separately examine restrictions on prices, activities and competition. Permission to distribute products does not, by itself, confer ownership of trademarks, marketing materials or works incorporated in them. Use of the relevant rights should be expressly addressed.

For accounting purposes, distinguish a purchase price reflecting a trade discount from a commission on receipts. Define the calculation basis, discounts, returns, reporting and payment dates, and expenses that may be deducted. As an arithmetic example only, if 120 units are sold at a uniform price of NIS 80, and 20 of those units are returned and credited, the amount after returns is NIS 8,000. Assuming a commission of 20% of that amount, the commission is NIS 1,600 and the calculated balance for the supplier is NIS 6,400. All amounts exclude VAT and precede any additional charges. This is not a recommended or customary commission rate.

When distribution ends, address stock, open orders, late returns, use of the brand and final accounting. Consignment requires a clear mechanism for tracking products delivered for sale that have not yet been sold. Dispatch alone is not necessarily a sale entitling the supplier to payment, and the arrangement’s title does not replace a definition of the obligations and risks.

A business collaboration agreement: a shared objective without unresolved gaps

A collaboration agreement defines the objective, each party’s contribution, decision-making authority and how customers and suppliers are engaged. Specify what counts as income or an expense of the activity, who may approve a budget and when distributions are made. An agreed percentage alone does not establish the calculation basis or authority to make commitments on another party’s behalf.

Examine rights in deliverables, use of pre-existing knowledge, confidentiality, the treatment of losses and an exit mechanism. Calling the agreement a “collaboration” or disclaiming a partnership in its title does not, by itself, determine how the relationship is classified. If the activity is shared over time or includes investment and ownership, its legal structure and implications require review.

Illustrative settlement in a commission model

How do returns change the calculation? Adjust the assumptions to see their effect on the commission and balance.

Revenue after returns
Commission on the entered assumption
Calculated supplier balance

Illustration only: a commission model, excluding VAT and other charges or deductions. Assumes a single price and fully refunded returns from the same sales group. Shipping to a distributor is not a sale; do not deduct returns twice from figures already stated net. The agreement and actual facts govern the settlement.

Trade discounts, different prices, uncollected credit sales, earlier-period returns or other charges require a different calculation. The result does not establish entitlement to payment or its due date.

Negotiations, quotations and agreements by email

A lengthy signed document is not necessary in every transaction for a contract to arise. A quotation, order or correspondence may also have binding significance, depending on its content and circumstances and subject to formal requirements imposed by law or agreed between the parties. It is therefore important to clarify which matters have already been agreed and which remain subject to approval or signature.

The duty to act in good faith also applies during negotiations. Material information, reservations and significant agreements should be appropriately reflected in the documents. The heading “non-binding” is no substitute for examining the document and the parties’ conduct as a whole. If work begins before the agreement is completed, establish what was ordered, the scope of the authority given, and what will be paid if negotiations do not lead to an agreement.

Identify the parties and who may make commitments on their behalf

A trading name on a quotation does not always identify the legal party entering into the contract. Check whether it is a company, partnership or individual running a business, and record its full name, identification number, address and contact details for notices. When several companies operate under the same brand, it matters which one places the order, which one performs the work and which one owes payment.

It is also necessary to establish who may sign and approve financial commitments. A technical contact may be authorised to give work instructions without being authorised to order a substantial addition to the price. Where necessary, obtain confirmation of signing authority and the approvals required. A director’s signature on behalf of a company is not, by itself, a personal guarantee of its debts. If a guarantee is required, it should be expressly documented and its terms reviewed.

Define deliverables, boundaries and milestones

Descriptions such as “project management” or “a complete system” can be understood in different ways. Specify what will be delivered, in which format, which stages are included and what falls outside the agreed price. For a website, for example, design, writing, development, hosting and maintenance are distinct components. Each requires a separate decision.

Alongside the supplier’s commitments, describe the customer’s duties: providing materials, being available for testing, granting access and approving decisions. Establish when the timetable starts and the effect of delays in providing information. Where performance depends on a licence, approval from an authority or another supplier, clarify who handles it and what happens if that condition is not met. Milestones should reflect progress that can be checked, rather than dates alone.

Address changes and the relationship between documents

A seemingly small addition may affect the project budget and delivery date. The change process should state how a request is submitted, who assesses its impact and who approves a revised price and timetable. Urgent work should also be addressed so that the team does not have to choose between stopping operations and proceeding without a documented agreement.

If the engagement includes a proposal, order, agreement and technical schedule, establish which document prevails if they conflict. A material promise made in conversation should also be appropriately reflected in the agreed wording. A change by email should fit the change process and the authority of the person who approved it; not every message from a contact person amends the agreement.

Contractual interpretation and the 2026 amendment

Amendment No. 3 to the Contracts (General Part) Law, published in January 2026, changed the framework for contractual interpretation. For a business contract that does not contain provisions on the method of interpretation, the general rule provides for interpretation by reference to its wording alone. However, the law sets out exceptions, including an unreasonable result or conflicting provisions. Different rules apply to contracts that are not business contracts, standard form contracts and employment contracts.

The type of contract, the parties’ legal representation and the amendment’s application to the date of formation or renewal must be checked. For an agreement on the method of interpretation, parties who are not represented by a lawyer in preparing the contract are treated as not having agreed on a method of interpretation. The heading “business agreement” or a general statement favouring the written wording is not enough. In practice, it is important to define obligations, exceptions and the relationship between documents, and to resolve inconsistencies in advance.

Set out the price and how it may change

The price should be clear to whoever processes the invoice months later. Is it a fixed sum, an hourly rate, a monthly fee or a charge based on usage? Does it include VAT, where applicable? Which incidental expenses are included, and when is prior approval needed for additional expenditure?

For a continuing engagement, address how long the price remains valid, any indexation, changes to rates and advance notice of adjustments. Hourly pricing can include a budget limit, periodic reporting and a warning before the budget is exhausted. For a success fee, define what counts as success, how it is measured and what happens if the outcome also results from other people’s actions. Unclear wording may leave the very entitlement to payment in dispute.

Link payment to review and consider security

Specify invoicing and payment dates, required documents, how invoices are delivered and how objections are raised. Where payment follows approval of a deliverable, address the review period, the comments that require correction and defects that do not prevent use. If acceptance by silence is proposed, consider whether it is reasonable and appropriate for the engagement.

An advance, payments by stages, a guarantee or retention of part of the price may address different risks. Check the amount, duration, enforcement conditions and release date of any security. Security that is too expensive can burden the transaction, while security that expires before performance is due may be ineffective. It is also useful to address disputed amounts without assuming that every dispute justifies withholding the entire payment.

Establish service levels and a response to delays

In a maintenance agreement or continuing service, “a quick response” is not a sufficient measure. Operating hours, severity levels, response times and resolution times can be defined. Acknowledging receipt of a request is different from resolving the problem. The commitment should therefore describe the result that can actually be expected.

For delays, address notification, a remedial plan, updates to the timetable and steps to reduce the impact. If a credit or compensation is agreed, explain what triggers it and how it relates to other remedies. A clause dealing with exceptional events should also consider their effect on performance, the length of the delay and possible alternatives. A security-related event, shortage or malfunction does not necessarily provide an automatic release from obligations. The agreement, circumstances and applicable law must be examined.

Distinguish the deliverable from the rights in it

Paying for software, photography, design or content does not necessarily mean that all copyright has passed to the customer. Establish which rights exist, who holds them and whether the agreement provides for a transfer of ownership or a licence to use the work. Material created specifically for the project should be distinguished from tools, templates and knowledge that the supplier already held.

An assignment of copyright or grant of an exclusive licence requires a written document. Moral rights and the permissions required for the intended use must also be examined. Acquiring a deliverable does not, by itself, transfer every right associated with it.

The agreement may address future use, modifications, transfer to another supplier, display in a portfolio and when permission takes effect. State whether source files, code and documentation will be provided instead of relying on a general promise to deliver the product. Where fonts, images, software components or other people’s materials are included, their licensing terms should be checked. A promise to transfer “all rights” does not remove a restriction arising from a third party’s rights.

Match confidentiality and privacy terms to the information shared

A confidentiality clause should identify the protected information, permitted recipients, permitted purposes and duration. Employees, advisers and subcontractors should be considered, together with suitable exceptions for public information or disclosure required by law. Use of the customer’s name for publicity also merits separate treatment.

Where the service involves access to personal information or a database, a general confidentiality undertaking is not enough on its own. Depending on the engagement and applicable law, review security risks, access permissions, processing purposes, use of subcontractors and reporting of security incidents. Address the return and deletion of information and removal of access when the engagement ends. Backups and statutory retention duties should be considered so that the contract does not promise immediate deletion that is impossible or unlawful.

Review liability, indemnities and insurance together

Allocating responsibility starts with identifying practical risks. Who is responsible for an error in the customer’s specifications, damage caused by the supplier’s employee or a claim that supplied material infringes another person’s rights? Set out how defects are reported and when an opportunity to remedy them is provided, rather than relying on a broad reference to full responsibility.

For a limitation of liability, examine the cap, calculation period, categories of loss and exceptions. For an indemnity, establish what triggers it, whether it covers third-party claims, who controls the defence and who may agree to a settlement. Do not assume that every limitation or indemnity is enforceable in every circumstance. If insurance is required, check that it matches the risks and commitments, including exclusions and deductibles, rather than relying on the policy’s title.

Plan for breach, termination and an orderly handover

Distinguish expiry of the agreed term, early termination by notice and termination for breach. The agreement should set out notice procedures, any cure periods, outstanding payments and the treatment of advances and work completed in part. In a breach, the right to terminate and the necessary steps depend, among other things, on its seriousness and the terms of the agreement and applicable law.

On termination, address the transfer of files and equipment, removal of permissions, assistance with changing suppliers and deadlines for completing the handover. Specify which obligations survive termination. Agreed damages should be connected to the risk anticipated when the contract was made. A court may reduce agreed damages where they bear no reasonable relationship to the damage that could have been foreseen as a probable consequence of the breach. Stopping work or terminating without a review may create additional exposure.

Choose a practical way to deal with disputes

The parties may agree that their contacts first refer the issue to authorised managers within a defined period. This can be particularly useful when a specific disagreement is delaying an active project. They should also decide whether undisputed work and payments will continue, and on what terms.

Mediation helps the parties reach an agreement, whereas arbitration is a process for deciding a dispute. If arbitration is chosen, address the appointment of the arbitrator and the features of the process instead of simply mentioning it in the contract. Each route requires consideration of cost, availability, urgent relief and enforcement of the outcome. A dispute resolution clause must fit the applicable law and jurisdiction rules so that it can be used when a disagreement arises.

Carry out additional checks when contracting outside Israel

In an international contract, examine the governing law separately from the forum in which a dispute will be heard. Choosing a particular law does not necessarily determine where proceedings will take place. Consider in advance how a decision could be enforced where the other party or its assets are located, obtaining local advice where needed.

Other matters include the controlling language, currency, transfer fees, withholding taxes, service of notices and transfers of information between countries. For the supply of goods, define responsibility for transport, insurance, customs and inspection on delivery. Translating an Israeli agreement into English does not, on its own, complete these checks. The way the contract will be performed and the relevant law may change the arrangements required.

Three situations that show whether an agreement works in practice

A supplier requests payment for work the customer considers part of the project

For example, a design was commissioned with two rounds of revisions, but the customer wants to change the concept after approving it. Define in advance what counts as a correction, what changes the scope, who may approve it and how the price and timetable will be adjusted. Without such a mechanism, even parties acting seriously may understand the same request differently.

A distributor reports sales, but some products have been returned

Establish whether the agreement calculates payment by reference to delivery to the distributor, sale to a shop, sale to the end customer or actual collection. The same products may appear at several stages and must not be counted twice. The agreement should specify how the report is verified, when a return is credited and how unsold units are treated.

A party wants to end a business relationship before the agreed term expires

A statement that “we are no longer working together” does not, by itself, settle the arrangements for ending the relationship. Examine the grounds for termination, notice periods, any opportunity to remedy a breach, work already performed, stock, files and access permissions. A transition arrangement may be needed to continue serving customers or complete existing orders.

Breach of contract: distinguish the available options

Enforcement, termination, restitution and damages are different remedies, each with conditions and limitations. Enforcement is not available automatically in every case, and termination does not always erase what has already happened. Examine whether the breach is fundamental, whether additional time or notice is required and which remedies may be combined without double recovery.

Even where the contract contains an agreed damages clause, document the breach and its consequences. A claim for compensation for loss requires consideration of matters including causation, foreseeability and mitigation, depending on the cause of action and applicable law. Unilateral action, such as stopping a service or enforcing security, requires review of the authority to do so and its consequences.

Deadlines and limitation: a letter does not stop the clock by itself

For ordinary contractual monetary claims that are not classified as real-property claims, a common starting point is a limitation period of seven years. It should not automatically be applied to every case. Time starts running by reference to the accrual of the cause of action, and special arrangements and exceptions exist. Instalment obligations, different breaches, discovery of facts and notices exchanged may require separate analysis.

Sending a formal notice, demanding payment or conducting negotiations does not, by itself, stop or reset the limitation period. In some circumstances, the other party’s acknowledgement of a right may affect the calculation, but this should not be relied on without review. Filing a claim and the consequences of its being struck out or dismissed are also subject to their own rules. If a deadline may be approaching, establish how to preserve the rights in time.

How can you prepare for an effective legal review?

Provide the complete draft and its schedules, rather than only the page that raised a question. Include the quotation, specifications, correspondence recording the agreed terms and earlier versions, and explain in plain language what the transaction is intended to make possible. Clarify which terms have already been promised and which commitments cannot be fulfilled operationally or financially.

The review is not simply a search for legal terminology. It examines the parties’ identities and authority, compares the agreement with the commercial reality, identifies points for negotiation and checks that the schedules are consistent. A useful document should also work for the person managing the project, handling the shipment or issuing the invoice.

After signing, retain a complete copy of the agreement and schedules, and assign responsibility for tracking payment, renewal and termination dates. The person managing the work should understand the change process and the limits of their authority. Changes to the service, price or scope of access to information may justify a documented amendment so that the contract continues to reflect the work in practice.

Frequently asked questions

Can a signed quotation be enough?

Sometimes, but check whether it contains the necessary terms and refers to any additional conditions. The question is not only whether a binding contract has been formed, but whether it explains what will be supplied, when payment is due and how changes or termination will be handled.

Can an agreement by email or in conversation be binding?

Yes, in appropriate circumstances. A contract does not always have to be a signed document, although legislation and certain agreements impose formal requirements. The content of the correspondence, the parties’ intentions and the circumstances of the engagement matter. Material agreements should be documented before performance begins.

The customer requests an addition. Must it be done at the original price?

Review the agreed scope and the change process. Before starting, document what was requested and its effect on the price and timetable. Not every request is an addition, and not every addition is included in the original price.

May work be stopped if payment is not made?

There is no single answer. Examine the agreement, the obligations due, the seriousness of the breach and any notices given. Also consider the consequences of stopping and whether a staged response or a request for security is possible in the circumstances.

Does paying for a deliverable grant all rights in it?

Not necessarily. Ownership and permissions depend on the type of work, its creator and the agreements made, alongside applicable law. Expressly define the rights granted, whether source files are supplied and how the deliverable may be used after the work ends.

Can the same contract be used for every customer?

A standard starting document can help with everyday work, but it should be adapted to the service, the type of customer and the risks. A material change in payment arrangements, information shared or liability calls for review. Standard terms may also be subject to legal scrutiny.

What should be brought for legal review before signing?

Bring the complete draft and schedules, quotation, specifications and key correspondence. Explain what the transaction is intended to achieve, which commitments have already been made and which conditions are not feasible operationally or financially.

What is the difference between a services contract and a supply contract?

A services contract focuses on the scope of work, deliverables and how they are reviewed. A supply contract also focuses on the product specifications, quantity, dispatch, receipt and dealing with defects. Some arrangements combine both types, such as supplying equipment with installation and maintenance. The relationship between the components must be addressed.

Should a distributor be given exclusivity?

There is no single answer. Examine the territory, sales channels, term and alternatives, and compare the exclusivity with the obligations the distributor accepts. Terms concerning prices, territories or restrictions on competition may also require review under competition law.

Does a formal notice alone preserve the deadline for bringing a claim?

No. Sending the notice does not, by itself, stop or reset the limitation period. Calculate the deadline under the relevant cause of action and law, and consider what action is needed to preserve the rights.

Can a lawyer guarantee that the agreement will be enforced?

A legal outcome cannot be guaranteed in advance. Drafting an agreement helps define the obligations and fit the mechanisms to the circumstances. A clause’s validity, its enforcement and the remedy granted if a dispute arises also depend on the law and the facts.

This article provides general information and is not a substitute for legal advice tailored to the engagement and its circumstances.